When working on a large-scale commercial construction project, it becomes necessary to use high-end tools. It may ensure a smooth operation. Whether it is a high-rise building or a retail park, it is necessary to plan everything. During the construction process, experts need to deliver the concrete to the right place fast and efficiently. Therefore, they may utilise concrete pumping services in Hampshire to complete the construction process with ease.
Still, they may come across some issues on the way. However, they have the knowledge and expertise to overcome them.
Common Issues and Their Solutions
Limited Access and Obstruction
Poor access can become a headache during a commercial construction project. If there is a narrow entry point, uneven terrain, or an existing structure, the construction process may be abruptly halted.
Experts recommend using a line pump, which usually remains flexible even in tight spaces, compared to the boom pump. However, it may require some planning. Following a survey of the location, it is possible to identify the obstruction that can hinder the way. It is better to prepare a route for the machinery or trucks to go in. The experts’ experience in handling narrow spaces may guarantee a seamless process.
Inconsistency in the Concrete Mix
When a pump becomes blocked due to improper mixing of the concrete, it may create pressure inside the system. It often leads to delays in the operation. If there is a dry mix, it may create friction within the line. Too wet a mix can cause trouble during curing. It may affect the final strength.
To avoid these issues, you should have a detailed chat with the concrete supplier. It is important to make sure that there is a strict quality control process in place. By including admixture with the concrete, you can achieve the desired mix, especially for longer line distance tasks.
Delays Connected to the Weather
Weather conditions such as frost, rain, and extreme heat can hamper concrete pours. Site safety becomes a concern, especially in wet conditions. On occasion, there may be an increase in the level of concrete segregation. If there is a delay in curing during the colder months, it may slow down the entire construction schedule.
One of the solutions to this issue is planning. It is better to have a team of experts on hand who understand the British weather well. Heated lines may be able to protect the pour. Proper strategising may help to continue with the construction in harsh weather.
Equipment Failure
If the pump fails to work, then it can add to the expense. An idle machine for even a few hours can increase the project budget. Due to poor maintenance, you may notice these failures. Sometimes, a mismatched pump type may cause the issue.
One of the best ways to avoid these issues is to hire concrete pumps from a reputable service provider. Routine maintenance of the equipment helps keep it in good condition.
Whenever you need concrete pumping services in Hampshire, experts from the Arun Pumpcrete can help you. Get in touch with our experts today!